<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="58684">
 <titleInfo>
  <title>Analisis Beban Kerja Dengan Metode Workload Analysis (WLA) Dalam Menentukan Jumlah Tenaga Kerja Optimal Di PT INDOJT</title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Hermanto</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Surakarta</placeTerm>
   <publisher>Universitas Sebelas Maret</publisher>
   <dateIssued>2020</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code"></languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Artikel Jurnal</form>
  <extent>hlm : 256-265</extent>
 </physicalDescription>
 <relatedItem type="series">
  <titleInfo/>
  <title>Performa : Media Ilmiah Teknik Industri</title>
 </relatedItem>
</mods>
<note>&#13;
Abstract&#13;
&#13;
Human resources is one of the important elements in the implementation of a project because of its considerable influence on costs and time. The workload borne by the workforce is closely related to the efficiency and effectiveness of a project. There are many ways that can be done in the efficiency of human resources, among others, by optimizing the number of workers. PT Jaya Teknik Indonesia, as one of the companies engaged in the contractor of Mechanics, Electrical, Electronics and Information Technology. also can not be separated from the problem of this workload, work that doubles with other jobs is one of the causes. By using the Workload Analysis (WLA) method to determine workload. From the results of the WLA analysis, it was found that the Quality control Tower 1 workload was 119%, Supervisor Tower 2 was 135% and Supervisor Tower 3 was 124% besides that, after calculation the optimal number of employees was obtained by adding 1 labor in Tower 1, Tower 2 and Tower 3.&#13;
</note>
<note type="statement of responsibility"></note>
<subject authority="">
 <topic>Teknik Industri</topic>
</subject>
<classification>JPMITI</classification>
<identifier type="isbn">14128624</identifier>
<location>
 <physicalLocation>Perpustakaan Teknik UPI YAI </physicalLocation>
 <shelfLocator>JPMITI V19N2 2020</shelfLocator>
 <holdingSimple>
  <copyInformation>
   <numerationAndChronology type="1">JPMITI4a-015</numerationAndChronology>
   <sublocation>Perpustakaan FT UPI YAI</sublocation>
   <shelfLocator>JPMITI V19N2 2020</shelfLocator>
  </copyInformation>
  <copyInformation>
   <numerationAndChronology type="1">JPMITI4b-015</numerationAndChronology>
   <sublocation>Perpustakaan FT UPI YAI</sublocation>
   <shelfLocator>JPMITI V19N2 2020</shelfLocator>
  </copyInformation>
  <copyInformation>
   <numerationAndChronology type="1">JPMITI4c-015</numerationAndChronology>
   <sublocation>Perpustakaan FT UPI YAI</sublocation>
   <shelfLocator>JPMITI V19N2 2020</shelfLocator>
  </copyInformation>
  <copyInformation>
   <numerationAndChronology type="1">JPMITI4d-015</numerationAndChronology>
   <sublocation>Perpustakaan FT UPI YAI</sublocation>
   <shelfLocator>JPMITI V19N2 2020</shelfLocator>
  </copyInformation>
 </holdingSimple>
</location>
<slims:image>JPMITI.png.png</slims:image>
<recordInfo>
 <recordIdentifier>58684</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2023-01-17 10:38:15</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2023-01-17 10:38:15</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>