<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="58699">
 <titleInfo>
  <title>Analysis of fuzzy TOPSIS Method in Determining Priority of Small Dams Construction</title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Ulfiana Destya</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Semarang</placeTerm>
   <publisher>Universitas Negeri Semarang</publisher>
   <dateIssued>2019</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">e</languageTerm>
  <languageTerm type="text">English</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Artikel Jurnal</form>
  <extent>hlm : 46-53</extent>
 </physicalDescription>
 <relatedItem type="series">
  <titleInfo/>
  <title>Jurnal Teknik Sipil dan Perencanaan</title>
 </relatedItem>
</mods>
<note>Abstract&#13;
&#13;
The limited government budget for the construction of small dam in Semarang Regency has led to the need to determine the construction priorities. However, the large number of construction's technical aspects causes the determination of the construction priorities to be difficult. One of the best methods for multi-criteria decision making is the Technique for Order Performance by Similarity to Ideal Solution (TOPSIS). However, ranking and weighting of the criteria that use in these constructions were difficult. It was caused by human assessment factors that were less precise especially on linguistic variables criteria. Therefore, a fuzzy logic was needed for calculating these criteria. There are eight alternatives of small dams and seven criteria of technical aspects analyzed in this study. The first step was determining membership function and weighting each criteria. Then, TOPSIS method was applied to ranked eight alternatives. The highest priority was determined by finding alternative that has the largest closeness coefficient (CCi). It represents alternative with closest distance to fuzzy positive ideal solution and farthest distance to fuzzy negative ideal solution. Based on analysis, Mluweh Dams has the highest CCi value of 0.612. It could be concluded that Mluweh Dams is the highest construction priority of small dams in Semarang Regency.&#13;
</note>
<note type="statement of responsibility"></note>
<subject authority="">
 <topic>Teknik Sipil</topic>
</subject>
<classification>JTSP</classification>
<identifier type="isbn">14111772</identifier>
<location>
 <physicalLocation>Perpustakaan Teknik UPI YAI </physicalLocation>
 <shelfLocator>JTSP V21N2 Oktober 2019</shelfLocator>
 <holdingSimple>
  <copyInformation>
   <numerationAndChronology type="1">JTSP2-001</numerationAndChronology>
   <sublocation>Perpustakaan FT UPI YAI</sublocation>
   <shelfLocator>JTSP V21N2 Oktober 2019</shelfLocator>
  </copyInformation>
 </holdingSimple>
</location>
<slims:image>JTSP.jpg.jpg</slims:image>
<recordInfo>
 <recordIdentifier>58699</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2023-01-18 10:19:37</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2023-01-18 10:37:01</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>